CNC Turning Parts
Delivery term:The date of payment from buyers deliver within days- Price:
Negotiable
- minimum:
- Total supply:
- Delivery term:
The date of payment from buyers deliver within days
- seat:
Guangdong
- Validity to:
Long-term effective
- Last update:
2021-06-29 00:39
- Browse the number:
287
- Dongguan Yejia Precision Machinery Co., Ltd By certification [File Integrity]
-
Contact:
dgyj123(Mr.)
- Email:
- Telephone:
- Phone:
-
Area:
Guangdong
-
Address:
Wuying Industrial Park, No.2 Hua'ertai Rd., Xinhe Community, Wanjiang District, Dongguan, Guangdong, China
- Website: http://www.yejia-machining.com/ http://dgyj123.link-water.com/
Product details
Product Specification
Part name: CNC Turning Parts
Working range: 1300X700mm
Precision shaft part, CNC lathe machine parts
Material: SKD11
Heat treatment: HRC58-62
Surface treatment: hard chromium plating
Accuracy: ±0.005mm
Applicable industry: Medical& health, electron, photoelectric, aerial, aviation, semi-conductor, optics, transportation, military & defense ,3D printer ,etc.
Raw Material And Feature
1. Stainless Steel: AISI303, 304, 316F, 420, 440, etc
2. Aluminum: AL5052,6061, 6063, 7075, 6082 ,etc
1). Lightweight, high strength and strong. Aluminum alloy materials are mostly hollow-core thin-wall composite cross-sections, which are convenient to use and reduce weight, and the cross-section has high bending strength, and the made parts have small deformation.
2). Good sealing performance. It is the material of choice for aerospace components.
3). Corrosion resistant, easy to use and maintain. The aluminum alloy parts are not rusty, non-fading, the surface does not need to be painted, and the maintenance cost is low.
4). High strength, good rigidity, strong and durable.
5). High use value.
6). Corrosion resistance, easy to use and maintain. Aluminum alloy does not need to be painted, does not fade, does not fall off, and the surface does not need to be repaired
Machining Process And Treatment
CNC Turning, milling, grinding, drilling, tapping, wire EDM cutting , etc
Surface Treatment: Sand blasting, polishing, anodize, nickel/zinc/chrome plating, passivation, power coating, heat treatment, etc
QA Policy
First In First Out for the raw material and finished product. 100% Inspection for the foreign trade purchase order.
Product Process
FAQ
Q: How long for the lead time?
7-10 days when receive the deposit after order.
Q2: How to pay for the order?
- Western union or paypal for the samples;Bulk product: T/T, western union or L/C.
Package
Anti-rust oil→ Sydney paper pack→ Bubble cotton pack→ Wooden/plastic box.
Shipment
http://www.yejia-machining.com/
-
Aluminum Can with Screw Cap
price: Negotiable
-
Industrial Panel PC Windows 10
price: Negotiable
-
Portable Badminton Net
price: Negotiable
-
Ip65 Industrial Touch Panel PC
price: Negotiable
-
Incontinence Bed Pads
price: Negotiable
-
Eco-friendly Squeeze PCR Tube
price: Negotiable